Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Gas Substitution

Industrial Natural Gas Substitution with WARP Syngas
The modular Gas Substitution system converts qualified waste-derived and biomass feedstocks into conditioned syngas for use as a gaseous fuel in industrial thermal processes.

A standard project configuration combines feedstock preparation or conditioning, where required, one or more WARP gasification modules and a dedicated syngas delivery and burner-control system.

Depending on the receiving equipment, WARP syngas can partially replace natural gas through co-firing or serve as the primary fuel in appropriately designed and qualified industrial processes.
Waste preparation → WARP gasification → conditioned syngas → gas control and burner system → industrial thermal process

A Gas Substitution system based on one standard WARP gasification module has the following indicative
operating figures:

How Gas Substitution Works

The Gas Substitution process comprises three main stages.

  1. Waste Preparation

The preparation system is configured according to the type and characteristics of the incoming feedstock.
For unsorted MSW, the system includes sorting, removal of inert materials, shredding, drying and homogenisation to produce fuel meeting WARP specifications.
Prepared RDF, SRF, biomass and other qualified fuels may require only project-specific conditioning.

2. WARP Gasification and Syngas Conditioning

Prepared feedstock is converted into syngas using WARP gasification technology.
The syngas is cooled and prepared within the WARP process before being supplied to the industrial fuel system.
Conditioned syngas is delivered according to the gas-quality, temperature, pressure and flow requirements of the receiving equipment.

3. Syngas Firing

Conditioned syngas is supplied to the industrial thermal process through a suitable gas control and burner system.
Natural gas may remain available for start-up, load control, peak demand and backup operation.

WARP Syngas Characteristics

WARP syngas contains combustible components, primarily hydrogen, carbon monoxide and methane, together with carbon dioxide, nitrogen and other minor constituents.

Its composition varies according to prepared-fuel characteristics and gasification conditions.

Indicative Syngas Composition

The ranges represent different fuels and operating conditions and should not be combined into a single fixed gas composition. For preliminary calculations, an indicative syngas lower heating value (LHV) of 4.5–5.5 MJ/Nm³ can be considered.

Using reference lower heating values of 5.0 MJ/Nm³ for WARP syngas and 35.8 MJ/Nm³ for natural gas:
1 Nm³ of natural gas ≈ 7.2 Nm³ of WARP syngas

The actual volumetric ratio depends on the measured heating values of both gases.

Standard Gas Substitution Configuration

The following parameters describe a representative Gas Substitution configuration based on one standard WARP module.

Indicative Parameters per Module

* For MSW projects, approximately 40,000 tonnes per year of prepared feedstock corresponds to an illustrative 80,000 tonnes per year of incoming raw MSW, assuming a 50% prepared-fuel yield. The actual ratio depends on waste composition, moisture content and preparation requirements. Where prepared RDF/SRF is supplied directly, incoming MSW is not a required on-site input.
The natural-gas equivalent represents the thermal energy contained in the reference syngas flow rather than a guaranteed reduction in natural-gas consumption.

Actual performance depends on prepared-fuel characteristics, syngas production, receiving equipment and the project-specific energy balance.

Modular Scaling

Gas Substitution capacity can be scaled by combining multiple standard WARP gasification modules.
The following table illustrates the natural-gas thermal-energy equivalent for configurations comprising one to four modules.

The calculation is based on 15,000 Nm³/h of syngas per module, a syngas LHV of 5.0 MJ/Nm³, a natural-gas LHV of 35.8 MJ/Nm³ and approximately 8,000 annual operating hours.

Indicative Natural Gas Equivalent by Number of Modules

These figures represent indicative natural-gas thermal-energy equivalents rather than guaranteed natural-gas displacement. Actual substitution depends on the industrial process, burner configuration, syngas characteristics and operating conditions.

Multiple WARP gasification modules can supply a common industrial syngas header or separate thermal consumers within the same facility.

Partial and Full Natural Gas Substitution

For existing natural-gas-fired equipment, WARP syngas can be introduced through a suitable burner and control system for partial natural-gas substitution.

For example, where an industrial process consumes approximately 7,000 Nm³/h of natural gas, one WARP module represents a thermal-energy equivalent of approximately 30% of the existing natural-gas input on the reference calculation basis.

Higher substitution levels, including full replacement of natural gas during normal operation, can be evaluated where the burner system and receiving thermal process are specifically designed or modified for syngas operation.

The achievable substitution percentage is determined by the individual industrial application and is not a fixed characteristic of the WARP gasification modules.

Syngas Delivery and Burner Integration

WARP syngas has a lower heating value per unit volume than natural gas. Delivering an equivalent thermal input therefore requires a higher volumetric gas flow.

The industrial fuel system must be designed to accommodate the required syngas flow, pressure and combustion characteristics. The integration assessment considers burner capacity, gas flow and pressure, Wobbe Index, combustion-air requirements, flame stability, furnace conditions, emissions and safety requirements. The syngas delivery specification also defines acceptable gas composition, heating value, temperature, moisture, particulate content and relevant gaseous contaminants.

Final burner and gas-system compatibility is established through project-specific engineering and equipment-supplier approval.

Industrial Gas Substitution Applications

WARP syngas can be considered for industrial facilities currently using natural gas or other gaseous fuels.

Typical applications include:

  • Industrial furnaces
  • Kilns and calciners
  • Hot Gas Generators
  • Gas-fired industrial boilers
  • Industrial dryers and ovens
  • Process heaters
  • Other continuous industrial thermal equipment
The achievable substitution level depends on the receiving equipment, required process temperatures and operating conditions.

Project Delivery Models

Univastum Gas Substitution projects can be delivered through equipment supply, integrated turnkey solutions or long-term Energy-as-a-Service arrangements.

For suitable larger projects, Build–Own–Operate (BOO) and Build–Own–Operate–Transfer (BOOT) structures may also be considered.

A preliminary project assessment can begin with the available waste or prepared-fuel volume, existing natural-gas consumption, target substitution level, thermal-process requirements and basic site conditions.