A Waste-to-Energy project starts not with technology, but with economics: secured feedstock, contracted revenues, disciplined CAPEX, controlled OPEX and properly allocated risks.
Secured waste supplyThe foundation of a project is a secured waste supply with defined volumes, known characteristics and a long-term contractual framework. The facility configuration and capacity are designed around the actual feedstock available to the project.
Contracted revenuesThe principal revenue streams are:
- Tipping fees / gate fees for waste acceptance and processing.
- Electricity sales.
- Steam and heat sales.
Recovered recyclables, other saleable products and, where applicable, carbon credits provide additional revenue streams.
Contractual foundationWaste supply and acceptance terms, tipping fees / gate fees, concession obligations and energy offtake are defined within the project’s long-term contractual framework.
This structure provides the basis for forecasting project cash flows and determining debt capacity.
Modular scalingProject capacity is built around standardized WARP modules, matched to secured waste volumes and energy offtake opportunities.
The modular architecture allows capacity to be configured around actual feedstock volumes and, where required, expanded as available waste volumes and energy demand grow.