Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Our Story: The Development of WARP

From early testing to integrated waste-to-energy projects
The gasification technology behind Univastum traces its origins to 2009. Years of testing and engineering development laid the foundations for an integrated approach to waste-to-energy. Univastum was established in Ireland in 2020 to further develop this approach and deliver projects internationally.
2009–2010
2009–2010
The first pilot plant
The first gasifier, with a capacity of 2 tonnes per hour, was designed in 2009. The plant was built in 2010, when pilot operation began.
Early work focused on validating technical solutions, refining the equipment design and establishing gasification operating parameters.
2012–2018
2012–2018
Testing and energy applications
Once stable operating conditions had been established, a series of trials with different waste types began. The findings helped refine requirements for feedstock, fuel preparation and operating parameters.
In parallel, work progressed on using the resulting gas for energy production. In 2017, syngas was successfully tested in an OPRA gas turbine in the Netherlands. Its use in a boiler for steam production was also tested, while configurations for electricity generation using steam turbines were explored.
Combined with the team’s experience in waste management, this work formed the basis of an integrated solution combining fuel preparation, gasification and energy generation.
2018–2019
2018–2019
Developing an integrated solution
In 2018, the technology was presented to prospective clients and partners, opening discussions about its applications. Their feedback helped refine requirements for capacity, equipment configuration and energy outputs.
By 2019, an integrated waste-to-energy project concept had been developed, covering the process from waste preparation to energy supply.
2020–2021
2020–2021
Establishing Univastum
Univastum was established in Ireland in 2020 to develop and deliver projects in international markets.
During 2020–2021, the company’s specialists adapted the engineering documentation to applicable European standards and requirements.
2022–2025
2022–2025
Developing the modular waste-to-energy platform
In 2022–2023, market requirements and project economics informed the decision to increase the design capacity of the gasification module from 2 to 5 tonnes per hour.
In 2025, Univastum brought its modular waste-to-energy solution, based on WARP gasification technology, to market. Depending on the project configuration, the solution is designed to produce electricity, industrial steam and heat, or to replace natural gas in industrial processes.
Today
Today
Univastum is developing its first commercial projects based on WARP gasification technology, drawing on years of testing and engineering development. The focus is on adapting solutions to site conditions and client requirements, and preparing projects for implementation. The engineering team continues to conduct research and testing aimed at adapting the WARP gasification technology for new markets and addressing the challenges of the modern markets.
This encompasses both the development of new products - such as methanol, synthetic fuels, and fertilizers - and the refinement of the technology itself to enhance its reliability, versatility, and efficiency.