Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Food & Beverage Manufacturing

Process Steam, Heat, Hot Water, Cooling and Electricity from MSW, RDF, SRF, Biomass, Food-Processing Residues and Other Suitable Fuels
The food and beverage industry includes manufacturing processes with very different energy profiles, including dairy processing, breweries and distilleries, beverage production, starch and sweeteners, vegetable oils, meat and fish processing, frozen foods, fruit and vegetable processing, coffee and cocoa.

Many of these facilities require several forms of energy simultaneously:
  • process steam
  • hot water
  • hot air and drying heat
  • electricity
  • chilled water and industrial refrigeration
Univastum develops modular Waste-to-Energy solutions based on its proprietary WARP® gasification technology, converting prepared MSW-derived fuel, RDF/SRF, biomass, suitable industrial waste and other qualified combustible materials into syngas for the production of process steam, heat, hot water, cooling and electricity.

Suitable in-house production residues may form part of the fuel mix, but a project does not depend on the food plant generating sufficient waste itself. External MSW-derived fuel, RDF/SRF, biomass, agricultural residues and suitable industrial waste can also be used.

The optimum configuration is determined by the site’s actual energy balance: steam and hot-water demand, natural-gas consumption, drying loads, refrigeration demand, electrical load, operating profile and available fuels.

These projects are developed as dedicated Waste-to-Steam / Waste-to-Energy utility systems integrated with existing plant infrastructure while minimising intervention in the core food-production process.

Potential Benefits for Food and Beverage Manufacturers

Multiple Energy Products from One Platform

A Univastum Waste-to-Energy system supplies project-specific combinations of:
  • process steam
  • hot water
  • process heat
  • hot gas / hot air
  • chilled water
  • electricity
The optimum mix is defined by the actual site energy balance.

Reduced Fossil-Fuel Consumption

Waste-derived syngas can replace part of the natural gas, LPG or other conventional fuel used for steam generation, dryers, ovens, roasters, thermal-oil systems and other thermal consumers.

Cooling from Recovered Heat or Steam

Where heat and refrigeration are required simultaneously, recovered heat or steam can be used for absorption cooling. This is particularly relevant to breweries, dairy plants, distilleries, beverage production and other facilities with a stable chilled-water load.

Fuel Diversification and Energy Cost Control

The fuel base can combine internal residues with MSW-derived fuel, external RDF/SRF, biomass and agricultural residues. This reduces dependence on one fuel source and allows the project to optimise availability, LHV, moisture, cost and seasonal stability.

Modular Expansion and Existing Backup

Additional WARP modules can be installed as production, energy demand or fuel availability increases. Existing boilers, refrigeration systems, conventional-fuel burners and grid connections can remain available for peak demand, maintenance and backup.

Food and Beverage Industries with High Integration Potential

The suitability of a food-processing facility depends primarily on the combination of thermal demand, refrigeration demand, operating hours, process profile and available fuels.

Typical Food-Industry Processes and Energy Products

One WARP gasification module downstream process can be configured differently on which energy
product creates the highest value for the Customer.
Important: these figures represent alternative or combined configurations. Maximum outputs should not be added together as if they were available simultaneously. The optimum allocation of energy is established through a project-specific mass and energy balance.

Typical Food-Industry Processes and Energy Products

One WARP module can be configured differently depending on which energy product creates the highest value for the site.
These values are preliminary engineering design ranges based on the standard 5 t/h WARP module and representative fuel properties. Project-specific performance is established through a detailed mass and energy balance during Pre-FEED / FEED.

WARP gasification system operates on prepared fuel.

Where incoming MSW is used, the project may include:
Sorting → Recovery of recyclables → Removal of inert fractions → Shredding → Drying → Fuel preparation → WARP
Incoming MSW and prepared fuel are consecutive stages of the same material flow and should not be added together as separate feed quantities.

Actual performance depends on the Feedstock Specification, LHV, moisture, ash content, steam conditions and selected energy configuration.

Waste-to-Steam for Food Manufacturing

For facilities with a stable steam load, the existing steam infrastructure is often the simplest brownfield integration point.
MSW / RDF / SRF / biomass / suitable industrial or food-processing residues → preparation → WARP → syngas → boiler → process steam
Steam can be supplied to an existing steam header for:
  • pasteurisation and sterilisation
  • evaporation and concentration
  • distillation
  • cooking and blanching
  • CIP and washing
  • process and water heating
Existing natural-gas boilers can remain available for startup, peak loads and backup, while WARP supplies the base load.

Syngas and Hot Gas for Drying and Process Heat

Hot air and process heat are important in milk and whey powder production, starch and grain processing, malt production, distillery residue drying, coffee and cocoa processing and other drying applications.

Typical configurations include:
WARP gasification → syngas → HGG → hot gas → dryer

or:

WARP gasification → conditioned syngas → burner → indirect air heater → clean hot air → food process
Where combustion products should not contact the product, indirect heating can be used. Direct use of syngas for process heat avoids unnecessary intermediate conversion of the full energy stream into steam or electricity.

Hot Water and Low-Temperature Heat

Food manufacturing requires substantial low-temperature heat for:
  • CIP and sanitation
  • washing
  • process-water preparation
  • bottle and container washing
  • pasteurisation
  • boiler-feedwater preheating
Recovered heat can therefore form an important part of the site energy balance.

A possible cascading arrangement is:
Hot syngas → Heat recovery → Secondary hot-water circuit → Process/CIP water heating
This recovers sensible heat through a separated heat-recovery circuit while maintaining separation between the syngas system and food-process utilities. The syngas chemical energy remains available for downstream energy use.

Cooling and Refrigeration

Many food and beverage plants require heating and refrigeration simultaneously. Typical applications include fermentation cooling, milk and beverage chilling, process-water cooling, maturation, cold storage and freezing.

Chilled Water

For chilled-water systems at approximately +5…+10°C, one possible configuration is:

recovered heat / steam → absorption chiller → chilled-water network

This is particularly relevant where recovered heat or surplus steam is available together with a stable base-load cooling demand. A cooling-oriented configuration can provide approximately 3 MW to more than 10 MW of cooling capacity, depending on the available heat source, temperature level, absorption-chiller configuration and site energy balance.

Low-Temperature Refrigeration

Below 0°C, particularly for freezing, the optimum system depends on the required temperature and existing refrigeration infrastructure.

Options include:
  • ammonia absorption systems;
  • existing mechanical ammonia refrigeration;
  • WARP-generated electricity for refrigeration compressors;
  • hybrid systems.
Cooling is treated as part of the integrated site energy balance rather than as fixed WARP gasification
solution output.

Integrated Utility Energy System

For large food and beverage facilities, Univastum can integrate WARP gasification with steam generation, hot-water recovery, process heat, cooling and optional CHP within a common utility system.
WARP gasification modules → common energy system → steam boiler + HGG + hot-water recovery + cooling + optional CHP
Energy can be allocated between process steam, hot water, drying and process heat, refrigeration and electricity according to site demand. This approach is especially relevant where several loads operate simultaneously.

Modular Energy Architecture

Additional WARP modules can be installed as energy demand and qualified fuel availability increase.
Steam-oriented configurations scale in a similar modular manner. Additional modules can therefore be added progressively as qualified fuel availability and site energy demand increase. The plant does not need to secure the full future fuel requirement or construct the maximum future energy capacity from the first phase.

With several modules, one unit can be taken offline for planned maintenance while the others continue operating.

A practical operating philosophy is:

WARP = base-load energy
existing utilities = peak load + backup

Waste and Alternative Fuel Sources

A food-processing plant does not need to generate enough waste itself to operate a WARP system.

Potential waste and fuel sources include:
  • MSW — municipal solid waste, after sorting and preparation
  • prepared MSW-derived fuel
  • RDF and SRF
  • suitable industrial waste
  • woody biomass and waste wood
  • agricultural and crop-processing residues
  • suitable food-processing residues
  • husks and shells
  • other non-recyclable combustible fractions
  • controlled blends of qualified fuels
Internal and external streams can be combined, for example:
Own production residues + Regional biomass + MSW-derived fuel + External RDF/SRF
This increases flexibility in fuel availability, LHV, moisture, cost and seasonal supply.

MSW as a Fuel Source

Municipal solid waste can be an important part of the fuel strategy where the plant’s own residues
are insufficient for year-round WARP gasification system operation.

A typical route is:
Incoming MSW → Sorting → Recovery of recyclables → Removal of inert fractions → Size reduction → Drying/Preparation → Prepared fuel → WARP gasification

For one standard module, the indicative flow may be up to:

~80,000 t/year incoming MSW
to produce approximately:
~40,000 t/year prepared fuel
depending on incoming moisture, composition and fuel-fraction yield.
Materials suitable for recycling should be directed to appropriate material-recycling routes.

Food-Processing Residues

Not every food-processing residue is an appropriate gasification fuel. Some streams may have high moisture, low LHV or a higher-value use as animal feed, biochemical feedstock or material resource.
Wet residues may require dewatering, drying or blending with drier fuels.

Feedstock qualification therefore considers:
  • moisture and LHV
  • ash
  • chlorine and sulphur
  • alkalis and metals
  • particle size and bulk properties
  • composition stability
  • preparation requirements
  • disposal cost
  • alternative commercial value

Integration into Existing Food Production

For a brownfield food-processing plant, the preferred first integration point is normally the utility infrastructure rather than the core production process.

Typical connection points include:
  • steam headers and boiler house
  • hot-water systems
  • HGG and dryers
  • process-heat systems
  • chilled-water and refrigeration utilities
  • electrical distribution
A staged integration may follow:
PHASE 1
Waste-to-Steam / Hot Water
Connection to existing utilities while conventional boilers remain available as backup
PHASE 2
HGG / Drying / Process Heat
Conditioned syngas is supplied to selected thermal consumers
PHASE 3
Cooling Integration
Recovered heat or steam is used for chilled-water production where economically justified
PHASE 4
Integrated Utility System / CHP
Multiple WARP modules supply several energy products through a common utility system

Food Safety and Process Separation

Waste handling and fuel preparation are physically separated from hygienic food-production areas.

Only the required utilities are transferred into the production environment:
  • steam
  • clean steam where required
  • hot water
  • chilled water
  • electricity
  • process heat
Where steam or another heating medium has direct product contact, applicable food-process requirements are assessed separately. If clean or culinary steam is required, a dedicated clean-steam generator can be installed between the energy system and the food process.

Gas-cleaning and emissions-control systems are configured according to the qualified fuel mix, applicable environmental requirements and project permitting conditions. Waste handling, gasification and emissions-control systems remain outside the hygienic food-production environment.

This maintains clear physical and process separation between waste and fuel handling and the food-manufacturing environment.

Potential Reduction in Fossil-Fuel Use and CO₂ Emissions

By displacing natural gas, LPG, fuel oil or part of grid electricity demand, a waste-derived energy system can reduce fossil-energy consumption associated with steam generation, drying, hot-water production, thermal processes and electricity.

Waste-derived energy should not automatically be classified as low-carbon solely because the feedstock is waste.

The resulting greenhouse-gas impact is determined for each project individually.

A project-specific assessment considers:
  • displaced fossil fuel
  • fuel LHV
  • fossil and biogenic fractions of MSW/RDF/SRF
  • fuel preparation
  • auxiliary electricity
  • transport
  • conversion efficiency
  • actual annual operating load

Project Development

A project starts with the site’s actual energy, utility and fuel balance. The project can then progress through Pre-FEED and FEED.

At an early stage, Univastum carries out a preliminary technical and economic assessment covering:
  • energy configuration
  • number of WARP modules
  • steam, thermal and refrigeration integration
  • fuel requirement and preliminary fuel mix
  • mass and energy balance
  • expected natural-gas displacement
  • CAPEX / OPEX basis
  • commercial model

Commercial Models

  • Supply and Integration of the Energy System
    Under this model, the food manufacturer or project owner owns the energy system.
    Univastum performs the agreed engineering scope, supplies the WARP® gasification system and associated Energy Island equipment, and integrates the system with the site’s steam, hot-water, thermal, refrigeration and electrical infrastructure.
    The customer may operate the system directly or use a separate O&M arrangement.
  • Energy-as-a-Service / Steam-as-a-Service
    Instead of purchasing the equipment, the customer may purchase an agreed energy product.
    The commercial delivery point may be defined as:
    X t/h process steam at Y barg at the customer’s battery limit
    or:
    X MWth process heat
    or:
    X MW chilled-water capacity
    or a combined supply of:
    steam + hot water + cooling + electricity
    Univastum or a dedicated project company may be responsible for fuel sourcing and preparation, gasification, energy production, O&M and agreed availability. The customer purchases the agreed energy product under a long-term supply agreement.

Data Required for Preliminary Assessment

The following information is used for the preliminary assessment.

Production

  • products and production capacity
  • annual production
  • operating hours and shifts
  • seasonality
  • planned expansion

Steam and Hot Water

  • pressure and temperature levels
  • average, minimum and peak steam demand
  • annual and seasonal profile
  • boiler capacities, fuels and efficiency
  • condensate return
  • hot-water temperatures and flows
  • CIP and process-water demand

Drying and Process Heat

  • dryers, ovens, roasters and fryers
  • HGG and thermal-oil systems
  • required temperatures
  • fuel consumption

Refrigeration

Cooling demand should be separated by temperature level:
  • chilled water at +5…+10°C
  • loads around 0°C
  • medium-temperature refrigeration
  • freezing
  • low-temperature cold storage
Additional data include refrigeration technology, refrigerant, compressor capacity, electricity consumption and average and peak cooling demand.

Electricity

  • base and peak load
  • annual consumption
  • tariff
  • grid limitations
  • existing CHP or generation

Waste and Fuel

For internal and external streams:
  • MSW and MSW-derived fuel
  • RDF/SRF
  • food-processing residues
  • biomass and agricultural residues
  • suitable industrial waste
Required information includes quantities, seasonality, composition, moisture, LHV, ash, disposal or purchase cost and alternative commercial use.

Site and Integration

  • available area
  • fuel logistics
  • utility connection points
  • refrigeration infrastructure
  • electrical connection
  • sanitary / production perimeter
  • distance between the energy island and consumers

Preliminary Technical and Economic Assessment

Based on the available information, Univastum develops the preliminary project basis, including:
  • preferred integration points;
  • net steam and hot-water demand;
  • cooling demand by temperature level;
  • drying and process-heat loads;
  • required number of WARP modules;
  • prepared-fuel and potential MSW requirement;
  • recommended fuel mix;
  • expected steam production;
  • HGG and cooling-integration potential;
  • electricity / CHP potential;
  • potential natural-gas displacement;
  • indicative CO₂e impact;
  • CAPEX / OPEX;
  • preliminary energy cost;
  • modular expansion pathway;
  • recommended commercial model.
Complete data are not required for the initial assessment.