Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy Projects in Development

Transforming innovative energy and environmental solutions into impactful projects that drive a sustainable future.
WASTE-TO-ELECTRICITY
34MW, Municipal Waste
Romania
Designed as a regional energy platform, the Romanian project will convert approximately 200,000 tonnes/year of prepared RDF/SRF and qualified industrial waste into dispatchable electricity. Five WARP modules provide a combined prepared-fuel capacity of approximately 25 t/h, supplying conditioned syngas to a central steam-based power island. The preliminary configuration targets around 34 MW of continuous net electrical export, or approximately 270 GWh/year. The modular arrangement allows individual gasification units to be maintained without shutting down the entire energy system. Engineering development is currently at the FEED stage.
WASTE-TO-STEAM
40t/h, Food&Beverage
Spain
The project developed for a large Food & Beverage manufacturing facility in Spain, with continuous industrial steam demand. Two WARP gasification modules are planned to process approximately 10 t/h of prepared RDF/SRF, producing about 31 MWth of conditioned syngas. The syngas will fuel a dedicated steam boiler, with an indicative gross capacity of approximately 42 t/h and a contractual steam supply target of approximately 40 t/h at 10 bar(g). Existing natural-gas boilers will remain available for peak demand, maintenance and backup. The project is currently at the FEED stage.
WASTE-TO-ELECTRICITY
27MW, Municipal Waste Management
Vietnam
A municipal Waste-to-Energy facility in Vietnam is being developed around locally sourced MSW converted into prepared fuel. Four WARP gasification modules are planned to process approximately 20 t/h of prepared MSW-derived fuel, producing conditioned syngas for a steam-based power island. The preliminary design basis is approximately 27 MW net electrical export, corresponding to around 215 GWh/year at 8,000 operating hours. The facility includes MSW preparation, WARP gasification, syngas preparation, steam generation and power production. The development is currently at the PreFEED stage.
WASTE-TO-ELECTRICITY
34MW, Municipal Waste Management
South Africa
The result should be a municipal Waste-to-Energy facility using pre-sorted RDF/SRF. Five WARP gasification modules are planned to process approximately 25.7 t/h of prepared fuel, producing syngas for a steam-based power island. The current design basis is approximately 34 MW net export, with an annual operating basis of about 8,000 hours. Waste preparation is limited to reception, bale opening, metal removal, shredding and final fuel conditioning. The project is currently at the PreFEED.