Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Agriculture & Agroprocessing

Process Steam, Drying Heat and Electricity from Agricultural Residues and Waste-Derived Fuels
Univastum develops modular Waste-to-Energy systems for agriculture and agroprocessing, using proprietary WARP® gasification technology to convert agricultural residues, biomass, RDF, SRF and prepared municipal and industrial waste into syngas used to generate process steam, drying heat and electricity.

Industrial applications include grain and rice processing, animal feed production, starch and ethanol plants, distilleries, vegetable oil, palm and coconut processing, sugar mills and other agro-industrial facilities.

WARP-based energy systems integrate with existing boilers, steam networks, dryers and thermal utilities to reduce conventional fuel consumption. Fuel selection and system configuration are determined by local feedstock availability, energy demand and operating requirements.

Energy Applications and Benefits

WARP-based systems can be configured to supply several energy products according to the requirements of an agricultural or agro-industrial facility.
The preferred configuration is determined by the facility's steam, thermal and electrical demand, available qualified fuel and annual operating profile.

For steam- and heat-intensive agroprocessing facilities, direct process steam and drying heat substitution are typically the primary applications, with electricity generation and cooling evaluated according to the site's energy balance.

Energy from Local Residues and Alternative Fuels

Suitable agricultural and agro-industrial residues can become part of the facility's energy supply. Regional biomass, prepared MSW-derived fuel, RDF/SRF and suitable industrial waste can supplement on-site residues where quantities are insufficient or seasonal.

Reduced Conventional Fuel Consumption

Waste-derived syngas can replace part of the natural gas, LPG, fuel oil or other conventional fuels used for steam generation, dryers, HGGs and suitable thermal consumers.

A practical operating arrangement is:
WARP-based energy system → base-load energy supply
Existing boilers, burners and grid connection → peak demand, backup and operational flexibility

Modular Expansion

Additional WARP modules can be installed as processing capacity, energy demand or qualified fuel availability increases. The maximum future system capacity does not need to be installed during the initial project phase.

Standard WARP Gasification Module

A standard WARP module processes approximately 5 tonnes of prepared fuel per hour, with an indicative annual operating basis of 8,000 hours.
Indicative Technical Parameters
* Incoming MSW and prepared fuel represent the same waste stream before and after preparation and should not be added together. Actual incoming MSW requirements depend on waste composition, moisture content and the required fuel specification.
The stated steam and electricity output ranges refer to separate steam-oriented and electricity-oriented configurations and should not be added together. Combined heat and power configurations are also available, with the allocation of energy between steam and electricity determined by the project-specific design.

Natural gas energy equivalent represents the chemical energy of the produced syngas, not guaranteed natural gas displacement at the manufacturing facility.

The indicated energy ranges are based on specified waste-derived fuels. Agricultural residues and biomass require separate fuel-specific performance assessment, taking into account lower heating value, moisture, ash and other relevant characteristics.

These figures are indicative engineering ranges. Project-specific performance, fuel displacement and energy delivery conditions are established through mass and energy balances during Pre-FEED / FEED.

Agroprocessing Applications

WARP integration can address several energy-intensive agricultural and agro-industrial manufacturing processes.
The strongest candidates are generally large, continuously operating facilities with substantial steam or thermal demand and access to sufficient qualified fuel.

Priority Industrial Applications

Starch, Ethanol and Distilleries

Starch and fermentation-based production can combine continuous steam requirements with evaporation, distillation and drying loads. WARP can supply process steam and HGG-based drying heat, with CHP evaluated where the site's electrical demand and energy balance justify it.

Vegetable Oils, Palm and Coconut

Oilseed and tropical crop processing may combine steam-intensive operations with locally available shells, fibres and other combustible residues. WARP can supply steam, drying heat and process heat. Where efficient biomass boilers or CHP systems already operate, integration is evaluated for additional capacity, fuel flexibility, production expansion or remaining fossil-fuel substitution.

Grain, Rice and Feed Processing

Large integrated facilities may combine grain drying, milling, feed production and several thermal consumers. A common WARP-based energy system can serve multiple dryers and steam users, reducing dependence on a single seasonal consumer and improving annual energy utilisation.

Sugar Processing

Many sugar mills already operate bagasse-fired boilers and CHP systems. WARP gasification, is most relevant where additional energy capacity, operation outside the processing season, alternative fuel flexibility or supplementary fossil-fuel substitution is required. The existing bagasse energy system remains the economic benchmark.

Process Heat and Agricultural Drying

Replacing Conventional Fuels in Industrial Drying Systems

Drying is one of the principal WARP applications in agroprocessing. Typical consumers include grain, rice, malt, animal feed, starch products, distillers dried grains with solubles (DDGS), coffee, cocoa and agricultural ingredient dryers. WARP converts prepared combustible fuels into syngas that can supply an HGG or suitable industrial burner.

A typical configuration is:
Prepared feedstock → WARP Gasification → Syngas → HGG → Hot gas → Industrial dryer
Where direct combustion-gas contact with the product is unsuitable, an indirect heating arrangement can be used:
Prepared feedstock → WARP Gasification → Conditioned syngas → Burner → Heat exchanger → Clean hot air → Dryer
The integration is developed around the existing dryer's required temperature, airflow, production capacity and product-quality requirements.

Integration with Existing Dryers

For many brownfield agroprocessing facilities, HGG or indirect-air-heater integration provides a practical first application.

The objective is to modify the energy supply while retaining the existing drying equipment wherever technically feasible.
Conventional burners and fuel systems can remain available for start-up, peak demand, maintenance and backup.

The suitability of direct or indirect heating depends on the product, dryer configuration, applicable process requirements and required air or gas quality.

Waste-to-Steam for Agroprocessing

Facilities with substantial continuous steam demand are particularly relevant for Waste-to-Steam applications. WARP can be integrated with a steam boiler to supply existing steam headers and process consumers.
Prepared feedstock → WARP Gasification → Syngas → Steam boiler → Process steam
Typical applications include:
  • Cooking and thermal processing
  • Evaporation and concentration
  • Distillation and fermentation-related utilities
  • Oilseed conditioning and refining
  • Process heating
  • Hot-water production
In a steam-oriented configuration, one standard WARP module supports the following indicative steam production ranges:
  • ~20–31 t/h using qualified RDF/SRF
  • ~17–25 t/h using prepared MSW-derived fuel
Steam output from agricultural residues and biomass is established separately according to the qualified fuel characteristics and boiler configuration.

For brownfield facilities, the existing steam header provides a defined integration point.

Conventional boilers can remain available for start-up, peak demand, maintenance and redundancy.
WARP can therefore be sized against the facility's stable base-load steam requirement rather than its maximum instantaneous demand.

Under a Steam-as-a-Service structure, the contracted energy product can be specified directly as:

X t/h of steam at Y barg and Z°C at the customer's battery limit.

Agricultural Residues and Alternative Fuel Strategy

Qualified Agricultural and Agro-Industrial Fuels

Potential WARP feedstocks include:
  • Agricultural husks and shells
  • Dry fibres and woody residues
  • Dry crop-processing residues
  • Qualified biomass and waste wood
  • Prepared MSW-derived fuel
  • RDF and SRF
  • Suitable industrial combustible waste
  • Controlled blends of qualified fuels
WARP gasification module operates on prepared fuel meeting a defined feedstock specification.

Not every agricultural residue is suitable for gasification. High-moisture materials such as manure, liquid organic effluent and certain wet processing residues may be better suited to anaerobic digestion or other biological treatment.

Where both wet and dry residues are available, a project may integrate WARP gasification solution with
a separately designed biogas or biological treatment system.

Managing Seasonality and Fuel Availability

Agricultural residue production can vary significantly throughout the year. A WARP project does not need to rely entirely on residues generated at one manufacturing site.

A project may use on-site agricultural residues, regional biomass, prepared MSW-derived fuel, RDF/SRF or suitable industrial waste, individually or in qualified blends, depending on fuel compatibility and system design.

This approach can reduce dependence on seasonal residue availability and support more consistent annual operation.

Fuel qualification considers:
  • Annual quantity and seasonal availability
  • Lower heating value and moisture
  • Ash content and behaviour
  • Chlorine, sulphur, alkalis and metals
  • Contaminants and composition stability
  • Fuel preparation and storage requirements
  • Transportation, logistics and delivered cost
  • Existing commercial or material uses
Agricultural residues should not automatically be considered zero-cost or unlimited. Some materials already have economic value as animal feed, soil amendments, industrial raw materials or existing boiler fuel. Where crop residues are removed from agricultural land, nutrient balance and soil-carbon requirements may also need to be considered.

The objective is to establish a sustainable, technically qualified fuel supply supported by enforceable commercial agreements, capable of meeting the project's annual energy production requirements.

Integrated Energy Systems and Brownfield Integration

Integrated Utility Energy Supply

Large agroprocessing facilities and agro-industrial parks may require several energy products simultaneously.

WARP modules can be integrated into a common energy system supplying process steam, drying heat, thermal utilities and electricity.

A potential configuration is:
WARP Gasification modules → Common syngas / Utility system → Steam + HGG / dryers + Process heat + Optional CHP
Different consumers can receive energy products according to their requirements:
  • Process steam: starch, ethanol, distilleries and vegetable-oil processing
  • Drying heat: grain, rice, animal feed and agricultural ingredient dryers
  • Process heat: thermal processing and suitable industrial heating systems
  • Electricity: on-site distribution and manufacturing loads
  • Recovered heat: hot-water systems and suitable heat-driven cooling applications
The configuration is determined by the simultaneous demand for each energy product, required delivery conditions and the available fuel energy.

Combined heat and power configurations are designed around the project's overall energy balance, with the allocation of available energy between process steam, thermal consumers and electricity determined by the specific system design.

Integration into Existing Agroprocessing Facilities

For brownfield facilities, a WARP-based energy system is normally integrated with existing utility infrastructure rather than requiring redesign of the core production process.

Typical connection points include HGGs, industrial dryers, steam headers, boiler houses, hot-water systems, thermal-oil systems, electrical distribution and existing CHP infrastructure.

Implementation can be phased:
Phase 1 — Initial Energy Integration
Introduce a WARP-based system for a defined drying, process heat or steam application
Phase 2 — Additional Thermal and Steam Consumers
Extend energy supply to further dryers, process heaters or steam users
Phase 3 — Integrated Utility System
Connect multiple energy consumers through a common syngas, steam or thermal utility system, adding WARP modules where required
Phase 4 — CHP and Multi-User Energy Supply
Introduce electricity generation or additional industrial energy consumers where technically and economically justified
Existing conventional fuel and utility systems can remain available for start-up, peak demand, maintenance, backup and operational flexibility.

Prioritising Thermal Energy Where Appropriate

Where a facility has substantial steam, drying or process-heat demand, direct thermal use of syngas should generally be evaluated before electricity-only generation.

Electricity generation remains relevant where electrical tariffs are high, grid capacity is limited, thermal demand is insufficient or CHP improves overall energy utilisation.

The preferred solution is determined by the site's actual energy balance and the economic value of each delivered energy product.

Fossil-Fuel Displacement and CO₂ Impact

Replacing natural gas, LPG, fuel oil, coal or purchased electricity with energy produced from qualified agricultural residues and alternative fuels can reduce conventional energy consumption and potentially lower greenhouse-gas emissions.

Actual CO₂ performance depends on:
  • The conventional fuel or electricity displaced
  • Fossil and biogenic fractions of the alternative feedstock
  • Sustainable residue availability and alternative biomass uses
  • Fuel preparation and drying
  • Transportation and logistics
  • Auxiliary electricity requirements
  • Conversion efficiency and annual plant utilisation
Agricultural residues should not automatically be treated as carbon-neutral.

Where residues are removed from agricultural land, potential effects on soil carbon and nutrient balances may need to be considered. The strongest decarbonisation opportunities generally arise where sustainably available biogenic residues displace significant fossil-fuel consumption at high-utilisation industrial facilities.

Project-specific environmental performance is assessed through the relevant energy, emissions and lifecycle calculations.

Commercial Models

Univastum develops Agriculture & Agroprocessing Waste-to-Energy projects through two principal commercial approaches.
  • Equipment Supply and Integration
    The agroprocessing company or project owner owns the energy system.
    Univastum supplies and integrates WARP gasification modules and associated energy equipment with the facility's existing steam, drying, thermal and electrical infrastructure.
    The scope can include engineering, equipment supply, project integration, commissioning and lifecycle support.
    The customer may operate the system directly or use an agreed operations and maintenance arrangement.
  • Energy-as-a-Service / Steam-as-a-Service
    Under an Energy-as-a-Service structure, the manufacturer purchases agreed energy products rather than investing directly in the WARP equipment.
    Contracted energy products may include:
    • Process steam: X t/h at Y barg and Z°C
    • Drying and process heat: X MWth or specified hot-gas delivery conditions
    • Electricity: X MWe
    • Integrated energy supply: an agreed combination of steam, heat and electricity
    Energy delivery conditions are defined at the customer's battery limit.
Univastum or a dedicated project company can take responsibility for fuel sourcing and preparation, gasification, energy production, operations, maintenance and agreed availability.

Project Assessment and Development

A preliminary project assessment starts with the agroprocessing facility's actual energy requirements, production profile and available qualified fuel supply.

The initial evaluation focuses on:
  • Production capacity, operating hours, seasonality and planned expansion
  • Steam demand, pressure, temperature and condensate return
  • Existing boilers, fuel consumption and principal thermal consumers
  • Dryer type, capacity, operating temperatures and annual utilisation
  • Electrical demand, tariffs, grid limitations and existing generation
  • Agricultural residue types, quantities, characteristics and seasonal availability
  • External biomass, RDF/SRF and prepared MSW-derived fuel availability
  • Existing utility infrastructure, available space and integration points
  • Preferred ownership and commercial structure
Based on these inputs, Univastum develops a preliminary technical and economic assessment covering the recommended integration configuration, number of WARP modules, qualified fuel requirements and proposed fuel mix, expected steam and process-heat output, dryer/HGG integration, electricity and CHP potential, conventional-fuel displacement, indicative CO₂ impact, preliminary CAPEX/OPEX, energy cost and the preferred delivery model.

The assessment can also identify modular expansion opportunities and the potential for supplying multiple energy consumers within an agro-industrial site or cluster.

Project-specific mass and energy balances, equipment selection and performance requirements are developed progressively through Pre-FEED / FEED.