Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Building Materials Manufacturing

Process Heat, Steam and Electricity from Waste-Derived Fuels
Building-material manufacturing requires substantial thermal energy, process steam and electricity. Brick and ceramic kilns, industrial dryers, gypsum calcination systems, AAC autoclaves, concrete curing facilities and other production processes depend on reliable energy supplies, often using natural gas or other conventional fuels.

Univastum develops modular Waste-to-Energy solutions based on its proprietary WARP® gasification technology, converting prepared RDF, SRF, MSW-derived fuel, biomass and qualified industrial waste into syngas for industrial heat, steam and electricity generation.

For existing manufacturing plants, the preferred approach is to integrate a WARP-based energy system with existing utility infrastructure, reducing conventional fuel consumption while retaining production equipment and backup fuel systems.

Building-material manufacturing also offers a second opportunity: the potential utilisation of gasification mineral residues as secondary raw materials or additives in selected construction products. Univastum is developing this pathway as part of an integrated approach to energy recovery and material utilisation in the building-materials industry.

Energy and Material Outputs

WARP-based systems can be configured around four principal outputs, depending on the plant's production processes and energy requirements.
The preferred configuration is determined by the facility's actual thermal, steam and electrical requirements, together with available qualified fuel and potential material-utilisation opportunities.

For most building-material producers, direct process heat and steam substitution are the primary applications, with electricity generation evaluated where the site's energy balance supports it.

Standard WARP Module

A standard WARP Gasification module processes approximately 5 tonnes of prepared fuel per hour, with an indicative annual operating basis of 8,000 hours.

Indicative Technical Parameters

* Incoming MSW and prepared fuel represent the same waste stream before and after preparation and should not be added together. Actual incoming MSW requirements depend on waste composition, moisture content and the required fuel specification.
The stated steam and electricity output ranges refer to separate steam-oriented and electricity-oriented configurations and should not be added together. Combined heat and power configurations are also available, with the allocation of energy between steam and electricity determined by the project-specific design.

Natural gas energy equivalent represents the chemical energy of the produced syngas, not guaranteed natural gas displacement at the manufacturing plant.
These figures are indicative engineering ranges. Project-specific performance, fuel displacement and energy delivery conditions are established through mass and energy balances during Pre-FEED / FEED.

Building Materials Applications

WARP integration can address several energy-intensive building-material manufacturing processes.
The strongest candidates are generally large, continuously operating manufacturing facilities with substantial thermal or steam demand and access to sufficient qualified alternative fuel.

Process Heat and Syngas Integration

Replacing Conventional Fuels in Industrial Thermal Processes

WARP converts prepared alternative fuels into syngas that can be used to supply industrial thermal systems.

A typical configuration is:
Prepared feedstock → WARP gasification module → Syngas → HGG/burner → Process heat
This approach is particularly relevant for brick and ceramic dryers, gypsum production, mineral wool curing and drying, wood-based panel manufacturing, asphalt production and other industrial thermal applications.

Dryers and Hot Gas Generators

For many existing manufacturing plants, an HGG-based configuration offers a practical first integration route.

Waste-derived syngas supplies an HGG or suitable burner system, delivering controlled thermal energy to existing drying equipment.

The integration can be developed around established temperature, airflow and production requirements, with conventional fuel systems retained for start-up, peak demand and backup.

Kilns, Calcination and High-Temperature Processes

Direct syngas integration into brick, ceramic, lime and other high-temperature systems is evaluated against the specific process requirements.

Key engineering considerations include:
  • Syngas composition, chemical energy and flow stability
  • Burner compatibility and combustion behaviour
  • Required process temperatures and temperature profiles
  • Furnace atmosphere and product-quality requirements
  • Existing fuel infrastructure and operational backup
For mineral wool and similar applications, lower-temperature curing and drying systems can be addressed before more complex integration into melting processes. For construction lime, syngas substitution can reduce fossil fuel consumption, but does not eliminate process CO₂ released through limestone decomposition.

The objective is to substitute conventional fuel without compromising manufacturing performance or product quality.

Waste-to-Steam for AAC and Precast Concrete

AAC production and large precast concrete facilities are particularly relevant for Waste-to-Steam applications because of their established steam requirements. WARP can be integrated with a steam boiler to supply autoclaves, concrete curing systems and other process steam consumers.
Prepared feedstock → WARP gasification module → Syngas → Steam boiler → Process steam
In a steam-oriented configuration, one standard WARP module supports the following indicative steam production ranges:

  • ~20–31 t/h using qualified RDF/SRF
  • ~17–25 t/h using prepared MSW-derived fuel
The final steam output depends on fuel characteristics, boiler configuration and the required delivery conditions.

For brownfield facilities, the existing steam header provides a defined integration point. Conventional boilers can remain available for peak demand, maintenance and redundancy. Under a Steam-as-a-

Service structure, the contracted product can be specified directly as:
X t/h of steam at Y barg and Z°C at the customer's battery limit.

Gasification Mineral Residue Utilisation

A Potential Secondary Raw Material for Building Products

Beyond energy production, WARP gasification generates mineral solid residues that may offer additional material value. Univastum is developing pathways for the qualification and utilisation of gasification mineral residues in selected building-material applications.

Potential applications include:
  • Bricks, roof tiles and ceramic bodies
  • Concrete blocks and selected precast products
  • Autoclaved aerated concrete formulations
  • Non-fired masonry products
  • Fillers and selected dry building mixes
The composition and suitability of the mineral residue depend on the incoming fuel, gasification conditions and the specific residue stream. Different solid residues, including gasification mineral residue and captured particulate materials, must be characterised separately rather than treated as interchangeable construction materials.

From Gasification Residue to Qualified Material

A potential material-utilisation pathway includes:
Gasification mineral residue → Characterisation → Processing → Product testing → Qualification → Secondary material application
Qualification may include:
  • Chemical composition and mineralogy
  • Particle-size distribution and residual carbon
  • Heavy metals and leaching behaviour
  • Pozzolanic or hydraulic activity where relevant
  • Strength, durability and product compatibility
  • Environmental requirements and applicable construction-product standards

Gasification mineral residue is not automatically an approved construction material. Its use depends on successful testing, qualification and compliance with the requirements of the intended product and jurisdiction.

Where qualification is successful, building-material producers may combine waste-derived process energy with the use of qualified mineral residues in selected products, reducing disposal requirements and creating an additional material value stream.

Qualified Alternative Fuels and Brownfield Integration

Fuel Supply and Preparation

Potential WARP feedstocks include prepared MSW-derived fuel, RDF, SRF, suitable industrial combustible waste, non-recyclable plastics, biomass, waste wood, selected production residues and controlled fuel blends.

WARP operates on prepared fuel meeting a defined feedstock specification.
Fuel qualification considers annual availability, lower heating value, moisture, ash, contaminants, composition stability, preparation requirements, logistics and delivered cost.

The objective is to establish a stable, technically qualified fuel supply supported by enforceable commercial agreements, ensuring reliable annual energy production.

Integration into Existing Manufacturing Plants

For brownfield facilities, a WARP-based energy system is normally integrated with existing utility infrastructure rather than requiring redesign of the core manufacturing process.

Typical connection points include HGGs, industrial dryers, selected burners and kilns, steam headers, autoclaves, curing systems and electrical distribution infrastructure.

Implementation can be phased:
Phase 1 — Initial Energy Integration
Introduce a WARP-based energy system for a defined process heat, drying or steam application
Phase 2 — Additional Energy Consumers
Extend the system to further dryers, steam users or selected thermal processes
Phase 3 — Integrated Energy Supply
Configure a common syngas, steam or thermal energy system serving multiple consumers, with additional WARP® modules where required
Phase 4 — Mineral Residue Utilisation
Introduce qualified mineral residues into selected building-material products where technical and regulatory requirements have been satisfied
Existing conventional fuel and utility systems can remain available for start-up, backup, peak demand and operational flexibility.

Fossil-Fuel Displacement and CO₂ Impact

Replacing natural gas, fuel oil, coal or purchased electricity with energy produced from qualified alternative fuels can reduce conventional energy consumption and potentially lower greenhouse-gas emissions.

Actual CO₂ performance depends on the displaced fuel, fossil and biogenic fractions of the alternative feedstock, fuel preparation and transportation, conversion efficiency and annual utilisation.

Waste-derived energy is not automatically renewable or zero-carbon. The potential environmental benefits of mineral-residue utilisation are assessed separately from energy-related emissions.

Commercial Models

Univastum develops building-material Waste-to-Energy projects through two principal commercial approaches.
  • Equipment Supply and Integration
    The manufacturing company or project owner owns the energy system.
    Univastum supplies and integrates WARP gasification modules and associated energy equipment with the facility's existing thermal, steam and electrical infrastructure.
    The scope can include engineering, equipment supply, project integration, commissioning and lifecycle support.
  • Energy-as-a-Service / Steam-as-a-Service
    Under an Energy-as-a-Service structure, the manufacturer purchases agreed energy products rather than investing directly in the WARP® equipment.
    Contracted energy products may include:
    • Process steam: X t/h at Y barg and Z°C.
    • Process heat: X MWth or specified hot-gas delivery conditions.
    • Electricity: X MWe.
    • Integrated energy supply: an agreed combination of steam, heat and electricity.
    Energy delivery conditions are defined at the customer's battery limit.
Univastum or a dedicated project company can take responsibility for fuel sourcing and preparation, gasification, energy production, operations, maintenance and agreed availability.

Mineral-residue processing or utilisation can be developed as a separate project-specific scope.

Project Assessment and Development

A preliminary project assessment starts with the manufacturing plant's actual energy requirements, existing fuel consumption and available alternative fuel supply.

The initial evaluation focuses on:
  • Production capacity, operating hours and planned expansion
  • Thermal loads, process temperatures and conventional fuel consumption
  • Steam pressure, temperature and demand profile
  • Electrical consumption and on-site generation requirements
  • Alternative fuel availability, characteristics and delivered cost
  • Existing utility infrastructure, available space and integration points
  • Potential mineral-residue applications and product qualification requirements
  • Preferred ownership and commercial structure
Based on these inputs, Univastum develops a preliminary technical and economic assessment covering the recommended integration configuration, number of WARP Gasification modules, fuel requirements, expected energy output, potential conventional-fuel displacement, mineral-residue opportunities, indicative CO₂ impact, preliminary CAPEX/OPEX and the preferred delivery model.

Project-specific mass and energy balances, equipment selection and performance requirements are developed progressively through Pre-FEED / FEED.

Complete technical data are not required for the initial discussion.