Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy Power for AI & Data Centers

Modular On-Site and Behind-the-Meter Electricity Generation from Qualified Alternative Fuels
Modular Waste-to-Energy power systems based on WARP® gasification technology generate electricity from prepared RDF, SRF, MSW-derived fuel, biomass and qualified industrial waste.

The technology converts prepared waste into syngas, which is used in an integrated boiler and steam turbine system for electricity generation.

These systems provide an additional on-site or near-site generation option for grid-constrained data centers, AI computing campuses, hyperscale developments and brownfield expansions.

Integration with existing grid connections, medium-voltage distribution, UPS, BESS and emergency generation infrastructure enables phased capacity expansion and can reduce dependence on grid-reinforcement schedules.

Power Applications and Benefits

Access to sufficient electrical capacity is a critical factor in the development and expansion of AI and data-center infrastructure. Utility connections, substations and grid reinforcement may not be available within the required development schedule.

WARP based power systems can supplement utility supply, provide continuous base-load generation
and support the progressive commissioning of data-center capacity.
WARP based energy solutions are intended primarily for continuous electricity generation. UPS, BESS and emergency-generation infrastructure remain part of the data center’s electrical resilience architecture based on local sources to provide energy independence.

The preferred configuration depends on the site’s electrical demand, available grid capacity, development schedule, qualified fuel supply and commercial requirements.

Project economics depend on the cost and availability of qualified fuel, local electricity tariffs, potential waste gate-fee revenues and the commercial value of earlier access to electrical capacity.

Standard WARP based Power Module

A standard WARP module processes approximately 5 tonnes of prepared fuel per hour, with an indicative annual operating basis of 8,000 hours. Electricity is generated through an integrated gasification, boiler and steam turbine system.
Prepared fuel → WARP gasification → syngas → boiler → steam turbine → electricity
Indicative Technical Parameters
* Incoming MSW and prepared fuel represent the same waste stream before and after preparation, not separate additive quantities. Actual throughput depends on waste composition and fuel-preparation requirements.
The indicated electrical output range applies to specified waste-derived fuels. Biomass and other alternative fuels require separate performance assessment.

Actual net generation depends on fuel characteristics, boiler and steam turbine selection, auxiliary consumption and overall plant configuration.
Modular Power Scaling
Prepared fuel and incoming MSW represent consecutive stages of the same waste stream and must not be added together. The indicated incoming MSW figures assume an illustrative prepared-fuel yield of approximately 50%. Actual requirements depend on waste composition, moisture content, material recovery and fuel-preparation yield.

The electrical capacity ranges are indicative and assume appropriately sized boiler, steam turbine and balance-of-plant equipment. Actual net output is determined during project-specific engineering.

Net electrical generation is not equivalent to supported IT load. Available IT capacity also depends on cooling, electrical distribution, PUE and other facility loads.

Project-specific performance is established through mass and energy balances during Pre-FEED / FEED.

Data Center Applications

WARP is particularly relevant where continuous electrical demand, limited grid capacity and a defined development schedule create a need for additional local generation.
WARP based generation can be integrated with existing grid connections, renewable generation, energy
storage and emergency-power infrastructure.

For large campuses, the system is intended to provide a defined portion of the overall electrical requirement rather than replace the complete power infrastructure.

Time-to-Power and Energy Island Integration

For grid-constrained data centers, the availability date of additional electrical capacity can be as important as its cost.

Where permitting, fuel supply and project delivery schedules allow, WARP® Energy Islands can be developed in parallel with utility reinforcement, potentially enabling earlier access to additional electrical capacity.

Modular Development

Additional WARP gasification modules and associated power-generation capacity can be introduced as computing demand increases.

The expansion strategy depends on the selected boiler, steam turbine, electrical infrastructure and shared balance-of-plant configuration.

Where project schedules require, initial generation phases may use externally prepared RDF or SRF, avoiding the immediate need to develop a complete local MSW sorting and fuel-preparation facility. Actual time-to-power depends on environmental permitting, generation licensing where applicable, fuel contracting, construction, grid-interface approvals and commissioning.

Behind-the-Meter and Near-Site Generation

A WARP Energy Island can be installed within the wider data-center development or at a separate nearby location.

Depending on the electrical connection and metering arrangement, the Energy Island may operate behind the customer’s meter or supply the data center through a dedicated private connection.

A typical integration concept is:
Grid + WARP Energy Island + other generation sources
↓
Data-center electrical distribution and resilience infrastructure
↓
IT, cooling and auxiliary loads
Near-site generation may be connected through a dedicated feeder or private electrical connection, subject to local regulations and connection approvals.

This allows fuel-handling and energy-generation infrastructure to be located outside the secure data-center perimeter where appropriate.

Reliability and Electrical Integration

WARP provides continuous generation within the wider data-center power architecture.

The required redundancy, contracted availability and electrical delivery conditions are established at project level.

Multiple gasification modules can provide operational flexibility, but module-level redundancy does not automatically establish N+1 power-system redundancy. Shared boilers, steam turbines and auxiliary systems must be considered in the overall reliability design.

UPS, BESS and other electrical infrastructure manage short-duration continuity and rapid load variations according to the data center’s requirements.

Alternative Fuels and Sustainability

WARP gasification operates on qualified prepared fuels, including:
  • RDF and SRF
  • Prepared MSW-derived fuel
  • Qualified biomass
  • Suitable industrial combustible waste
  • Controlled blends of qualified fuels
Fuel qualification and supply planning consider heating value, moisture, ash, contaminants, logistics, storage requirements and long-term contracted availability to support continuous plant operation.

Remote Energy Island and Fuel Supply

A dedicated Energy Island can receive prepared RDF or SRF from regional waste-processing facilities, reducing the need for on-site waste sorting and preparation.
Regional RDF / SRF supply → WARP Energy Island → dedicated electrical connection → data center
Where existing RDF/SRF production capacity is insufficient, a dedicated MSW sorting and fuel-preparation facility can be incorporated into the wider project.

The preferred fuel-supply arrangement depends on available regional waste infrastructure, contracted quantities, fuel specifications and logistics.

Cooling, Heat Recovery and CO₂ Impact

Electricity, generated at WARP based Waste-to-Electricity solution can supply the data center’s existing
cooling infrastructure.

Where technically and commercially justified, recovered heat or steam may also support absorption cooling, hot-water production or other heat-recovery applications.

Electricity generation from qualified alternative fuels can reduce reliance on conventional electricity sources. Actual CO₂ performance depends on the displaced energy source, fossil and biogenic fuel fractions, logistics and overall conversion efficiency.

Waste-derived electricity is not automatically classified as renewable or zero-carbon. Environmental performance is evaluated for each project.

Commercial Models

  • Equipment Supply and Integration
    Univastum provides engineering, equipment supply and integration of WARP based power systems owned by the customer.
  • Power-as-a-Service / Energy-as-a-Service
    Univastum or a dedicated project company develops, arranges financing for, owns and operates the Energy Island, supplying electricity under a long-term PPA or Energy-as-a-Service agreement.

Project Assessment and Development

Each project is assessed based on the data center’s power requirements, available grid capacity, development schedule, site conditions and qualified fuel supply.

Univastum develops a preliminary technical and economic assessment covering the proposed WARP configuration, expected electrical output, integration requirements and commercial feasibility.