Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Petrochemical Plants

Industrial Steam, Electricity, Process Heat and Syngas for Partial Natural Gas Substitution — All from Prepared Waste-Derived Fuels.
Univastum developed modular Waste-to-Energy solutions based on its proprietary WARP gasification technology for petrochemical plants, integrated refinery-petrochemical complexes and chemical manufacturing facilities. These solutions convert prepared waste-derived fuels into syngas for the production of industrial steam, electricity and process heat, as well as the partial substitution of conventional gaseous fuels.

For existing facilities, the energy plant can be located separately from the main process units and integrated with existing steam, electrical and thermal systems. Prepared fuel can be sourced from external suppliers, while the customer retains control of its core production processes.

Energy Solutions for Petrochemical Plants

Univastum’s solutions can be applied to integrated refinery-petrochemical complexes, olefins production, aromatics manufacturing, polymer production, chemical intermediates and large multi-plant industrial sites.

Project suitability depends primarily on sustained steam, electricity and heat demand, operating hours, fuel availability and the potential for integration with existing utility infrastructure.

Examples of WARP Applications in Petrochemical Plants

The configuration is determined by the site’s actual energy demand profile, existing utility network parameters, manufacturing scale and project economics. For large complexes, a central energy facility serving several process units or industrial plants may be considered.

Industrial Steam

For petrochemical facilities with substantial and sustained steam demand, connection to the existing steam infrastructure is one of the main WARP integration options.
Prepared Fuel → WARP gasification→ Syngas → Steam Boiler → Plant Steam Network
Industrial steam can be supplied to existing high-, medium- or low-pressure (HP/MP/LP) steam networks. Steam production capacity, supply parameters and connection points are determined by the site’s overall steam balance, existing steam sources and the requirements of individual process units.

Electricity & Combined Heat and Power

A power generation configuration can supply electricity to pumps, compressors, cooling systems, water treatment facilities, auxiliary equipment and other consumers within a petrochemical plant.

The indicative electrical capacity of a power generation facility based on one standard WARP module is 5.5–8 MW, depending on fuel characteristics and the configuration of the generation equipment.

Where both electricity and steam are required, combined heat and power (CHP) may be considered. The configuration is determined by the site’s overall energy balance, including existing steam networks at different pressure levels and opportunities to utilise the generated heat.

Syngas & Partial Gaseous Fuel Substitution

Conditioned WARP syngas can be used to partially replace natural gas and, where applicable, site fuel gas in compatible industrial thermal equipment
Prepared Fuel → WARP gasification → Conditioned Syngas → Compatible Thermal Equipment
Potential applications include auxiliary steam boilers, hot-gas generators and selected process furnaces. The feasibility of syngas utilisation depends on equipment compatibility, industrial safety requirements and any necessary modifications to fuel supply and combustion systems.

Syngas characteristics, supply parameters, operating conditions and backup fuel arrangements are agreed during project engineering.

Dedicated Energy Island & Integration with Existing Infrastructure

For existing petrochemical plants, Univastum offers a dedicated Energy Island, connected to the site’s steam, electrical and thermal systems, as well as compatible syngas consumers, through agreed delivery points.

Integration is designed around existing infrastructure, industrial safety requirements and the need to maintain production continuity. Core petrochemical processes remain under the customer’s operational control.

Utility Reliability & Redundancy

WARP gasification can be used to supply the petrochemical facility’s base-load energy requirements. Existing boilers, conventional fuel systems and grid connections may be retained to meet peak demand, provide backup during maintenance and maintain continuity of energy supply.

The required backup capacity, supply parameters and conditions for switching between energy sources are defined during project engineering. A multi-module configuration can be designed to continue operating at reduced capacity when an individual module is taken offline for maintenance, subject to the design of shared systems.

Fuel Supply

The WARP energy facility can use prepared fuel derived from municipal solid waste (MSW), RDF, SRF, suitable biomass and selected non-hazardous combustible industrial waste streams that meet project-specific technical and regulatory requirements.

Fuel supply can be arranged through external providers under long-term agreements. During project development, Univastum assesses fuel availability, quality, cost, preparation requirements and logistics to support reliable operation of the energy facility.

Project Delivery Models

Univastum offers two main project delivery models: equipment supply and integration or Energy-as-a-Service.

Under Energy-as-a-Service, the customer purchases industrial steam, electricity, heat or syngas meeting agreed specifications through a long-term agreement, without having to invest in its own energy facility. Financing, construction, operations and maintenance may be undertaken by Univastum or a dedicated project company, subject to the contractual arrangements.

How a Project Starts

A preliminary assessment begins with an evaluation of the petrochemical facility’s actual energy requirements and existing utility infrastructure.
Based on the available information, Univastum assesses the potential configuration, integration points, scale of the energy facility, steam and electricity generation potential, opportunities for partial gaseous fuel substitution, redundancy requirements and preliminary project economics.