Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Pulp & Paper Mills

Process Steam, Drying Heat, Syngas and Electricity from MSW, RDF, SRF, Paper-Mill Residues, Biomass and Other Suitable Fuels
Univastum develops modular Waste-to-Energy solutions based on its proprietary WARP gasification technology, converting prepared waste-derived and biomass fuels into syngas for industrial steam, direct process heat, fuel substitution and electricity.
The pulp and paper industry includes production routes with fundamentally different energy balances. Recycled paper and board mills, tissue mills, non-integrated paper mills and kraft pulp mills therefore require different WARP integration strategies.

Typical energy requirements include:
  • process steam
  • paper-machine drying
  • tissue Yankee drying
  • hot-air and impingement drying
  • process and water heating
  • electricity for drives, pumps, fans and vacuum systems
  • lime-kiln fuel at kraft pulp mills
Potential waste and fuel sources include RDF/SRF, prepared MSW-derived fuel, paper-mill rejects, suitable prepared sludge, industrial waste, waste wood, biomass, agricultural residues and other qualified combustible fractions.

The optimum configuration depends on the mill’s actual energy balance, existing boilers and CHP systems, natural-gas consumption, drying loads, internal energy generation and available fuel streams.
For most brownfield mills, the preferred first integration point is the existing utility infrastructure rather than modification of the paper-making process itself.

Univastum can therefore develop dedicated Waste-to-Steam, syngas-based fuel-substitution or integrated mill energy systems with limited interference in core production.

Four Energy Products. One Technology Platform.

A Univastum Waste-to-Energy system can be configured around the mill’s actual energy requirements.

Process Steam

Waste-derived syngas can be converted into steam for paper-machine drying, pulp processing, evaporation, water heating and other steam consumers.

Drying Heat

Syngas can supply Hot Gas Generators, air heaters and suitable burner systems for tissue hoods, coating dryers, pulp dryers and other drying applications.

Syngas for Fuel Substitution

Conditioned syngas can be supplied to selected thermal consumers, including lime kilns and suitable dual-fuel systems, partially replacing natural gas or other conventional fuels.

Electricity

Where economically justified, WARP® syngas can be used for electricity generation or as part of a combined steam, heat and power system.
The objective is to allocate available fuel energy between steam, direct heat, syngas for fuel substitution and electricity according to the actual mill energy balance.
Potential Benefits for Pulp and Paper Mills
    • Waste-derived process steam from RDF/SRF, prepared MSW-derived fuel, paper-mill residues, biomass and other suitable fuels.
    • Reduced natural-gas consumption in boilers, tissue drying, HGG systems, dryers and potentially lime kilns.
    • Use of suitable mill residues as part of the fuel mix where technically and economically justified.
    • Access to external fuels such as MSW-derived fuel, RDF/SRF, biomass and regional industrial residues where internal waste is insufficient.
    • Energy cost control through diversification away from a single fossil fuel and, where relevant, reduced waste-disposal cost.
    • Multiple energy products from one integrated system: steam, direct heat, syngas for fuel substitution and optional electricity.
    • Modular brownfield integration with existing boilers and utilities retained for start-up, peak demand and backup.
    • Potential reduction in greenhouse-gas emissions where fossil energy is displaced by suitable waste-derived or biogenic energy.

Pulp and Paper Segments and Typical Energy Configurations

Different mill types require different integration strategies.

WARP Integration Points in Pulp and Paper Mills

Standard WARP Gasification Module — Indicative Design Basis

For preliminary project screening, one standard WARP gasification module can be considered on the
following basis:
The different syngas-energy ranges reflect the different indicative fuel-energy basis. At approximately 5 t/h prepared fuel, RDF/SRF generally provides a higher thermal input than prepared MSW-derived fuel and therefore a correspondingly higher syngas-energy and steam-production range.

At approximately 8,000 operating hours per year, one module corresponds on an energy-equivalent basis to roughly:

  • 12–18 million Nm³/year of natural gas on the RDF/SRF basis; or
  • 10–15 million Nm³/year of natural gas on the prepared MSW-derived fuel basis.

Actual displacement depends on fuel properties, syngas composition, natural-gas calorific value and the efficiency of the specific thermal consumer.
These values are preliminary engineering design ranges based on the standard 5 t/h WARP module and representative fuel properties. Final performance is established during Pre-FEED / FEED against the agreed Feedstock Specification and project-specific mass and energy balance.
WARP gasification module operates on prepared fuel. Where MSW is used, the project may include:
Sorting → Recovery of recyclable materials → Removal of inert fractions → Shredding → Drying → Fuel preparation → WARP gasification
Approximately 80,000 t/year incoming MSW and 40,000 t/year prepared fuel represent different stages of the same preparation chain and are not additive.

Recycled Paper and Board Mills

Recycled containerboard, cartonboard and other recovered-fibre mills are particularly relevant because they often combine continuous steam demand, paper-machine drying, mill rejects and no internal chemical-recovery energy system.

A typical first-stage configuration is:
Prepared mill residues / RDF / SRF / MSW-derived fuel / Biomass → WARP gasification → Syngas → Boiler → Existing steam header → Paper-machine drying
A WARP-based Waste-to-Steam system can provide base-load steam while the existing boiler house remains available for start-up, peak demand, maintenance and backup.

Indicative Mill Size

For preliminary market screening, recycled-paper and board mills of approximately:
  • 150,000–500,000 t/year
    can represent a relevant range for one or several WARP modules
Final sizing depends on actual steam consumption, operating hours, steam conditions, existing heat recovery, CHP configuration and qualified fuel availability. This range is a screening indication rather than a technical limit on applicability.

Tissue Mills — Steam and High-Temperature Drying Heat

Tissue production commonly requires two major thermal products:
  • steam for the Yankee cylinder
  • high-temperature hot air for the Yankee hood
This enables an integrated configuration:
WARP gasification → Common syngas system → Syngas boiler → Yankee steam → Conditioned syngas → Hood burner / HGG → Hot drying air
Recovered heat can additionally support boiler feedwater, process water and other low-temperature loads. This configuration allows part of the syngas to be used directly as thermal fuel rather than converting all available energy into steam.

Indicative Tissue-Mill Target

For preliminary market screening, relevant sites may include:
  • a large tissue line of approximately 150–300 t/day
  • multi-machine sites of approximately 300–600 t/day

Sites where WARP based solution can serve both steam and direct drying heat are generally more
attractive than installations supplying a small steam load alone. These ranges are intended for initial
market screening and do not define minimum or maximum project size.

Kraft Pulp Mills

Kraft mills have a different energy architecture because black liquor is processed through a recovery system that provides both energy and recovery of pulping chemicals. The recovery boiler is therefore not a primary WARP® replacement target.

WARP gasification solution should instead address fossil-fuel and auxiliary loads outside the core
chemical-recovery loop.

Lime Kiln

The lime kiln is a particularly relevant direct-syngas application:
Prepared biomass / Suitable mill residues / RDF / MSW-derived fuel → WARP gasification → conditioned syngas → Lime-kiln burner
A standard WARP gasification module provides approximately:
  • 15–23 MWth of syngas energy on an RDF/SRF basis or
  • 12–19 MWth on a prepared MSW-derived fuel basis
For a medium-size lime kiln, this can represent a material share of the total thermal load. For preliminary project screening, approximately 30% substitution of the lime-kiln thermal input can be used as a practical first-stage WARP integration target. The 30% figure is not a technical maximum.

Actual substitution is determined by:
  • kiln thermal demand
  • selected WARP gasification fuel basis
  • syngas LHV and composition
  • burner capacity and turndown
  • kiln temperature profile
  • process stability
  • contaminant limits
  • number of WARP gasification modules
Initial operation can therefore begin with approximately 30% fossil-fuel substitution, while the existing natural-gas or fuel-oil system remains available for start-up, process control, peak demand and backup.
Higher substitution can subsequently be evaluated based on operating results, fuel availability and additional WARP gasification capacity.

Auxiliary Steam and Heat

A WARP-based energy system can also support auxiliary steam, pulp drying, process heating and optional CHP. System size should be based on the net mill energy deficit after recovery-boiler steam, biomass boilers and other internal energy sources are accounted for.

Indicative Kraft-Mill Target

For preliminary commercial screening, older or medium-sized kraft mills of approximately:

300,000–800,000 t/year

can be relevant where they retain fossil-fired lime kilns or significant auxiliary fossil-fuel demand and have access to suitable internal or external fuels. Large modern bioproduct mills with extensive internal biomass energy generation require project-specific assessment.

Non-Integrated Paper Mills

Mills purchasing market pulp can be particularly suitable for Waste-to-Steam because they may combine high continuous drying loads and natural-gas consumption without a recovery boiler.

A typical configuration is:
MSW-derived fuel / RDF / SRF / Biomass / Suitable residues → WARP gasification → Syngas → Boiler → Steam header
Direct syngas use may later be added for coating dryers, hot-air systems or specialty-paper drying.

For preliminary market screening, mills of approximately:

100,000–400,000 t/year
may represent a relevant scale for one or several WARP gasification modules.

Waste-to-Steam for Paper Production

For mills with stable steam demand, a WARP-based Waste-to-Steam system can be configured around prepared fuels from several sources.

Where incoming MSW is used:
MSW → Sorting and fuel preparation → Prepared MSW-derived fuel
The prepared fuel then enters the energy system:
Prepared MSW-derived fuel / RDF / SRF / Prepared paper-mill residues / Suitable industrial waste / Biomass → WARP gasification → Syngas → Boiler → Process steam
Indicative production from one standard module is approximately:
  • 20–31 t/h of process steam with prepared RDF/SRF or
  • 17–25 t/h with prepared MSW-derived fuel
These ranges correspond to the different indicative syngas-energy basis shown above.
Two modules may therefore represent an initial screening range of approximately:
35–60 t/h of process steam
depending on fuel quality, steam conditions and system configuration.

These values are preliminary engineering ranges rather than performance guarantees.

Syngas and Hot Gas for Paper and Tissue Drying

For direct drying applications:
RDF / SRF / MSW-derived fuel / Biomass / Prepared residues → WARP gasification → Syngas → HGG → Hot gas → Dryer
or:
WARP gasification → Conditioned syngas → Burner → Indirect air heater → Clean hot air → Process
Potential consumers include Yankee hoods, pulp and coating dryers, impingement systems and other suitable hot-air processes.

Indirect heating can be used where combustion products should not enter the process-air stream.
Existing conventional-fuel systems can remain available for start-up, peak demand and backup.

Syngas and Hot Gas for Paper and Tissue Drying

At kraft mills, direct use of syngas in a lime kiln may create more value than converting the same gas entirely into steam.

A typical chain is:
Prepared alternative fuel → WARP gasification → Syngas conditioning → Pressure and flow control → Lime-kiln burner
The initial substitution level is established during project engineering based on kiln thermal demand, syngas characteristics, burner configuration and process requirements.

Engineering should consider:
  • kiln thermal load
  • syngas LHV and composition
  • volumetric gas flow
  • burner compatibility
  • flame characteristics
  • kiln temperature profile
  • sulphur, chlorine, dust and alkalis
  • process control
  • conventional-fuel backup
The existing fossil-fuel system remains available during initial integration. Higher substitution can be evaluated after operational validation and, where required, by adding WARP gasification modules.

Integrated Steam, Drying Heat and Power

Where several energy loads operate simultaneously, multiple WARP® modules can feed a common energy system:
WARP gasification modules → common syngas system → steam boiler + HGG / direct thermal consumers + optional CHP
Energy can be allocated between process steam, tissue and paper drying, lime-kiln fuel, other process heat and electricity.

Direct steam and thermal applications should normally be evaluated before electricity-only generation where they provide more effective utilisation of available fuel energy.
An electricity-oriented standard module can provide approximately:
5.5–8 MWe net
depending on fuel, power-island configuration and auxiliary consumption.

WARP Compared with Conventional Mill Energy Options

WARP is not intended to replace every conventional energy technology used in the pulp and paper industry. Its advantages are most relevant where modularity, fuel flexibility and multiple energy products create value.
For very large continuous thermal loads with a single stable fuel source, a large BFB/CFB boiler or gasifier may remain preferable.

WARP is particularly relevant where the mill benefits from modular capacity, phased expansion, multiple thermal uses or a diversified waste-derived fuel portfolio.

Modular Energy Architecture

One standard module processes approximately:

5 t/h of prepared fuel
or
40,000 t/year
at about 8,000 operating hours per year
The syngas-energy column above is shown on an RDF/SRF basis. Prepared MSW-derived fuel has a lower indicative syngas-energy range, as shown in the Standard WARP gasification module design basis above.

Steam-oriented and direct-heat configurations scale in a similar modular manner. This allows the mill to start with one energy block and expand as qualified fuel supply and energy demand increase.

With several modules, an individual unit can be isolated for maintenance while the remaining modules continue operating at available capacity.

Waste and Alternative Fuel Sources

A WARP-based Waste-to-Energy project can use one primary fuel or a controlled blend of:
  • prepared MSW-derived fuel
  • RDF and SRF
  • paper-mill and plastics-rich rejects
  • suitable dewatered and dried sludge
  • industrial waste
  • waste wood and bark
  • woody biomass
  • agricultural residues
  • other qualified combustible fractions
The mill does not need to generate its entire fuel requirement internally.

A project may combine:
Paper-mill residues + External RDF/SRF + MSW-derived fuel + Waste wood + Biomass
The objective is to establish a stable long-term fuel mix based on:
Availability + LHV + Moisture + Contaminant limits + Cost + Supply security
Feedstock qualification includes LHV, moisture, ash, chlorine, sulphur, alkalis, metals, particle size and composition stability. Materials suitable for recycling should be directed to appropriate material-recycling routes.

Paper-Mill Rejects and Sludge

Paper-mill residues require qualification before use as WARP fuel. Combustible recycled-paper rejects may form part of the fuel mix, while sludge can require:
Mechanical dewatering → Thermal drying → Blending with drier fuels
before gasification.

Assessment should consider moisture, LHV, ash, contaminants, drying requirements, disposal cost and alternative recovery options. For many mills, the optimum solution will be a controlled blend of internal residues and external RDF/MSW-derived fuel or biomass, rather than exclusive reliance on mill residues.

MSW as an External Fuel Source

Prepared MSW-derived fuel can supplement mill residues where internal fuel is insufficient for continuous operation. WARP® does not use untreated wet mixed MSW directly.

A typical preparation route is:
Incoming MSW → Sorting → Recovery of recyclables → Removal of inert fractions → Shredding → Drying / preparation → Prepared MSW-derived fuel → WARP gasification
For one standard module, up to approximately:

~80,000 t/year of incoming MSW
to produce approximately:
~40,000 t/year of prepared fuel
depending on incoming moisture, composition and fuel-fraction yield

Integration into an Existing Pulp and Paper Mill

For most brownfield mills, the lowest-risk first step is integration into existing utility infrastructure.

Typical connection points include:
  • steam headers and boiler house
  • Yankee steam systems and hoods
  • paper, pulp and coating dryers
  • Hot Gas Generators
  • lime kilns
  • heat-recovery systems
  • electrical distribution
  • CHP infrastructure
A practical development path is:
PHASE 1
Waste-to-Steam
WARP gasification → syngas boiler → existing steam header
Existing boilers remain available for peak load and backup
PHASE 2
Mill Residue and Fuel Integration
Qualify internal residues and external RDF/MSW-derived fuel, biomass or waste wood and establish the long-term fuel blend
PHASE 3
Direct Syngas Applications
Introduce conditioned syngas into selected consumers such as Yankee hoods, dryers, HGGs or lime kilns
PHASE 4
Additional WARP Gasification Modules
Increase waste-derived energy production and fossil-fuel substitution as qualified fuel supply and mill demand grow.
PHASE 5
CHP / Integrated Energy System
Add electricity generation or broader syngas distribution where technically and economically justified.
This approach allows operating experience to be accumulated before deeper integration into critical production systems.

Potential Reduction in Fossil-Fuel Use and CO₂ Emissions

The potential impact depends strongly on mill type.

At recycled-paper, tissue and non-integrated paper mills, WARP can reduce fossil fuel used for steam, drying, hot-air systems and purchased electricity.

At kraft mills, where black liquor and biomass may already provide much of the energy supply, the principal opportunity may be fossil-fuel displacement in lime kilns, auxiliary boilers and selected thermal consumers.

Project-specific CO₂ assessment should consider:
  • displaced fossil energy
  • fuel LHV
  • fossil and biogenic fractions of waste-derived fuels
  • conversion efficiency
  • auxiliary electricity
  • fuel preparation and transport
  • actual mill utilisation
Waste-derived energy should not automatically be classified as low-carbon simply because the feedstock is waste.

Project Economics and Value Drivers

The business case can combine several value streams.

Avoided Fossil-Fuel Cost

Natural gas or other fossil fuel displaced in steam generation, drying, lime kilns and other thermal loads.

Reduced Waste-Disposal Cost

Suitable prepared mill residues can become part of the fuel system where this creates greater value than external disposal or another recovery route.

External Waste-Fuel Economics

RDF/SRF, prepared MSW-derived fuel or other qualified fuels may provide a competitive delivered energy cost depending on the local market.

Electricity

CHP or power generation can reduce purchased electricity where economically justified.

Carbon

Where applicable, fossil-energy displacement may support carbon-related project economics, subject to the relevant methodology, certification framework and carbon market.
The preliminary business case should therefore consider:
Avoided fossil-fuel cost + Avoided electricity cost + Avoided waste-disposal cost − Fuel procurement − Fuel preparation − Transport − O&M
Where applicable, gate fees or other waste-acceptance revenues may provide an additional project revenue stream.

The project economics should therefore be assessed across the complete energy and fuel system rather than by comparing WARP only with the cost of a conventional steam boiler.

Project Development

A project starts with the mill’s actual energy, utility and fuel balance.

At an early stage, Univastum assesses the mill energy balance, steam deficit, direct thermal loads, natural-gas consumption, internal and external fuel availability, potential integration points and required WARP capacity to define the preliminary technical and economic configuration.

The project can then progress through Pre-FEED and FEED.

Commercial Models

  • Supply and Integration of the Energy System
    Under this model, the pulp or paper producer owns the energy system.
    Univastum performs the agreed engineering scope, supplies the WARP gasification system and associated Energy Island equipment, and integrates the system with the mill’s steam, drying, heat-recovery, gaseous-fuel and electrical infrastructure.
    The final scope is defined around the required energy products, Feedstock Specification, existing infrastructure and agreed battery limits.
    The customer may operate the system directly or use a separate O&M arrangement.
  • Energy-as-a-Service / Steam-as-a-Service
    For mills with stable long-term energy demand, the customer may purchase an agreed energy product instead of owning the energy system.
    The commercial delivery point may be defined as:
    X t/h of steam at Y barg and Z°C at the mill battery limit
    or:
    X MWth of process heat
    or an agreed combination of:
    steam + heat + electricity
    Univastum or a dedicated project company may be responsible for fuel sourcing and preparation, gasification, energy production, O&M and agreed availability, while the customer purchases the agreed energy product under a long-term contract.

Data Required for Preliminary Assessment

The following information is used for the preliminary assessment.

Production

  • mill type and grades
  • annual production
  • machine capacity and operating hours
  • planned expansion

Steam and Existing Generation

  • pressure and temperature levels
  • minimum, average and peak demand
  • annual consumption
  • natural-gas, biomass, recovery and waste boilers
  • CHP capacity and utilisation

Fuels and Thermal Consumers

  • natural-gas and other fuel consumption and cost
  • principal thermal consumers
  • lime-kiln, Yankee-hood and dryer loads

Drying and Electricity

  • paper, pulp, Yankee and coating drying systems
  • operating temperatures and heat recovery
  • electrical base and peak load
  • annual consumption, tariff and grid constraints

Mill Residues and External Fuels

For internal and external streams:
  • quantity and annual availability
  • moisture
  • LHV
  • ash and contaminants
  • disposal or purchase cost
  • supply security

Kraft-Mill Recovery System

Where applicable:
  • recovery-boiler and biomass-boiler capacity
  • black-liquor balance
  • bark availability
  • lime-kiln thermal load and fuel
  • auxiliary steam balance

Site and Integration

  • available area
  • fuel logistics
  • steam and electrical connection points
  • distance to thermal consumers
  • environmental and permitting constraints

Preliminary Technical and Economic Assessment

Based on the available information, Univastum develops the preliminary project basis, including:
  • preferred initial integration point
  • net steam and direct thermal demand
  • potential Yankee / HGG / dryer / lime-kiln integration
  • indicative lime-kiln substitution level
  • required number of WARP® modules
  • prepared-fuel requirement and recommended fuel mix
  • potential utilisation of internal residues and external RDF, SRF and MSW-derived fuel
  • expected steam and syngas production
  • optional electricity / CHP potential
  • natural-gas displacement
  • potential reduction in disposal cost
  • indicative CO₂ impact
  • preliminary CAPEX / OPEX and energy cost
  • modular expansion pathway
  • recommended commercial model
Complete data are not required for the initial assessment.
Additional parameters can be developed progressively during Pre-FEED / FEED.